top of page

Burlington NC Fire Station No. 6

425 South Lexington Avenue, Burlington, NC, USA

Fire

14,536 sqft

Property Description

SCNA provided services for the design of the City of Burlington’s new fire station. The City provided surveying and site design services on an undeveloped piece of property.


The City desired to incorporate energy efficiency elements of the LEED process into the design to minimize the life cycle cost of the Fire Station.


This station emphasis on sustainability includes solar water heaters, high insulation values, increased natural day lighting with appropriate shading devices, enhanced lighting and HVAC controls. The City required the following features: three drive-through bays and training room.

Contact Agent

Fire Chief Jay A. Smith

336-229-3547

Property Details

Property Type

Fire Station

Final Cost

$3,240,000

Floors

2

Year Built

2017

Property Location

425 South Lexington Avenue, Burlington, NC, USA

bottom of page