top of page
Property Description
The scope of the project was defined as an initial Phase I project to include a 4-Story pre-engineered training tower with attached two and one story training building containing live burn rooms for Class A live burns.
The project included site grading for the entire master planned site along with access and roads from the adjacent city streets. The municipal water line extended into the site for hydrant water and as a potable water source.
Contact Agent
Jim Stumbo
704-865-6311
Property Details
Property Type
Public Safety Training Center
Final Cost
$800,000
Floors
2
Year Built
2020
Property Location
1255 West Mills Street, Columbus, NC 28722, USA
bottom of page