Property Description
SCN Architects worked in conjunction with the owner’s representative to provide economical, budget-conscious training aides for the Emergency Training Services complex. The burn building is designed for Class A combustible burns. The tower includes elevator doors and shafts, vertical and horizontal confined space drill components, electrical panel and valve lockout props, and floor, wall and ceiling tie-offs on all levels.
The total construction cost was $3.5 million.
PROJECT PHASES
Phase 1 – Master Plan, Site Grading & Burn Building
Phase 2 – Drill Tower
Phase 3 – Service Building
(Started Phase 1: 2000 – Completed Phase 3: 2005)
CAPABILITIES & FEATURES
4-Story Burn Building – 20,459 SF
4-Story Drill Tower – 5,074 SF
Service Building – 8.990 SF
Driving Track
Hose Drying Tower
Drafting Pits
Oil Separator
Contact Agent
Jim Stumbo
704-865-6311
Property Details
Property Type
Public Safety Training Center
Final Cost
$3,500,000
Floors
1
Year Built
2005
Property Location
601 E Main St, Jamestown, NC 27282, USA