top of page
Property Description
After successfully offering consulting services to the City for Station No. 1, Stewart-Cooper-Newell Architects teamed with a local architecture firm Plunkett Raysich Architects to assist in the design of Fire Substation No. 5.
Station No. 5 was designed as a prototype so that future Stations No. 2 & 3 will be based on the same design. The Station also shares its property and road access with the existing William Oliver Recreation Park.
Contact Agent
Ken Newell
704-865-6311
Property Details
Property Type
Fire Station
Final Cost
$2,800,000
Floors
1
Year Built
2007
Property Location
3051 Summit Ave, Waukesha, WI 53188, USA
bottom of page