top of page

White House TN Fire Station No. 2

120 Business Park Dr, White House, TN 37188, USA

Fire

12,197 sqft

Property Description

Stewart-Cooper-Newell Architects teamed with Kline Swinney Associates of Nashville to design a new fire station for White House, TN. The station’s main floor has a gross SF of 10,800, with an 1190 SF mezzanine. The station provides private, co-ed sleeping spaces for firefighters, along with a training room that seats approximately 50 occupants. This space is also available for public meetings and can be closed off from the remainder of the station as needed.


The station incorporates several sustainable design features. The roof and site water runoff are channeled to the Pump Test Pit, which holds water to be used when testing the fire truck pumping apparatus. A geothermal HVAC system and a white roof were included for reducing energy consumption.


Based on a steel structure, the exterior facade is composed of masonry-on-metal studs at the occupied portion of the building and masonry-on-masonry at the truck bays. The station’s floors are stained concrete with epoxy at the truck bays, and the ceilings are primarily acoustic lay-in.



Contact Agent

Ken Newell

704-865-6311

Property Details

Property Type

Fire Station

Final Cost

$2,400,000

Floors

1

Year Built

2007

Property Location

120 Business Park Dr, White House, TN 37188, USA

bottom of page